Driveway Estimator
Select your surface parameters to calculate a supply & installation cost bracket and project timeline.
Your Project Summary & Estimate
UK Resin Bound Surfacing Benchmark Costs
| Existing Ground Base |
Cost per m² |
Typical Prep Duration |
Groundwork Scope |
| Concrete Overlay |
£70 / m² |
1 - 2 Days |
Clean, prime, direct overlay |
| Tarmac / Asphalt |
£80 / m² |
2 - 3 Days |
Minor patch, primer, overlay |
| Block Paving / Damaged |
£110 / m² |
3 - 4 Days |
Partial lift & sub-base leveling |
| Grass / Bare Earth |
£135 / m² |
4 - 6 Days |
Full excavation & MOT Type 1 base |
Decorative borders: Aluminium/steel edge trim (standard), granite cobble setts (+£12/m²), or contrasting resin bands (+£8/m²). All estimates include UV-stable aliphatic polyurethane resin.